| Field | WOR | TDS ppm | PW Vol/day | Cost/bbl | Annual Cost | DOE Tech | Status |
|---|---|---|---|---|---|---|---|
| ${r.f} | ${r.wor} | ${r.tds} | ${r.vol} | ${r.cost} | ${r.ann} | ${r.doe} | ${r.st} |
| PORTFOLIO TOTAL | 3.7 avg | — | 2.09M bbl | $1.31 avg | $1.555B/yr | 7 labs | ACTIVE |
| ◈ These 7 priority fields represent the majority of Algeria's upstream hydrocarbon production. The DATA Terminal is fully extensible to Sonatrach's complete operating portfolio upon provision of field-level produced water data under NDA. | |||||||
| Competitor | Category | Current Role | DATA Advantage |
|---|---|---|---|
| SUEZ & Veolia (France) | Chemical treatment + ops | Long-standing treatment and operational management contracts | No DOE portfolio. No WIPS equivalent. No royalty modeling. |
| Hyflux / GS Inima | RO membranes | High-salinity produced water and desalination membranes | Hardware only. No technoeconomic optimization. |
| SLB / Baker Hughes | Integrated water-to-injection | El Borma II (Berkine) — EOR and high-volume injection | No dedicated water intelligence platform. |
| Siemens / Schneider | Generic industrial IoT | Competing for Sonatrach digital water monitoring layer | Confirmed gap: no Algeria-specific intelligence, no DOE integration |
| DuPont FilmTec / Toray | Membrane suppliers | 5 new desalination mega-plants (Tlemcen, Chlef, etc.) by 2030 | Component suppliers only — no platform, no commercialization. |
| Perimeter | Primary Water Challenge | Competitive Leaders | DATA WIPS/TIPS Advantage |
|---|---|---|---|
| El Borma II (Berkine) | EOR & High-Volume Injection | SLB / Baker Hughes | Argonne AMEWS + WIPS technoeconomic model |
| Illizi Centre I | Remote site recycling — exploration | Saur International / Veolia | NREL solar + containerized DOE train + WIPS ROI |
| Hassi Messaoud Refineries | Industrial effluent + oily sludge | Suez / Petrofac | Idaho NL ZLD + Sandia electrocoag + WIPS royalty calculator |
| Oued Mya / Ouargla | NSAS aquifer protection | No clear leader | WIPS NSAS layer + WaterTAP + ESG reporting |
| Production (oil) | 170,000 bbl/day |
| Produced water volume | 884,000 bbl/day |
| Water-to-oil ratio | 5.2 : 1 |
| TDS (formation water) | 50,000–250,000 ppm |
| NORM contamination | CONFIRMED |
| H₂S present | CONFIRMED |
| Scale minerals | CaCO₃, CaSO₄ |
| Distance to sea | 600 km — no ZLD outlet |
| Aquifer risk | NSAS directly below |
| Reinjection cost | $1.82/bbl |
| Annual disposal cost | $587M/year |
| Block designation | El Borma II — Berkine Basin |
| Bid submission deadline | November 26, 2026 |
| Contract award | November 26, 2026 |
| Sonatrach signing | January 31, 2027 |
| Evaluation type | Technical + Financial |
| WOR (estimated) | 2.9 : 1 |
| TDS range | 85,000–110,000 ppm |
| Gas infrastructure | Adjacent — Flare-to-Compute ready |
| DATA recommendation | HIGHEST PRIORITY |
| DOE National Lab | Technology | TRL | Max TDS (ppm) | Energy (kWh/m³) | Algeria Application | Status |
|---|---|---|---|---|---|---|
| Argonne · AMEWS | Anti-fouling nanomembranes | 7–8 | 250,000+ | 3.2–5.1 | Hassi Messaoud ultra-high TDS brine | READY |
| Berkeley Lab · NAWI | WaterTAP optimization platform | 9 | Any | N/A | National planning + pilot simulation | DEPLOYABLE |
| Oak Ridge · ORNL | Low-energy RO + gas hydrate | 6–7 | 35,000 / 200,000 | 1.8–2.4 | Oued Mya + Berkine moderate TDS | PILOT |
| NREL | Solar-integrated desalination | 8 | 80,000 | 0.8–1.6 | Remote Saharan sites — off-grid | READY |
| Idaho NL | ZLD crystallization + mineral recovery | 6 | Any | 12–18 | Hassi Messaoud ZLD mandate | DEVELOPING |
| NETL | AI-driven water monitoring + SCADA | 7 | N/A | N/A | All basins — operational intelligence | READY |
| Sandia NL | Electrocoagulation + electrochemical | 6–7 | 150,000 | 2.1–3.8 | Illizi — BTEX + heavy metals removal | PILOT |
| Regulatory Requirement | Framework | Applicable Fields | Deadline | Penalty / Exposure | WaterPlan Action |
|---|---|---|---|---|---|
| Water management plan submission | ALNAFT Bid Round 2026 | All 7 bid blocks | Nov 26, 2026 | Bid disqualification | ↗ Generate now |
| Hydraulic royalty on non-recycled water | Law 19-13, Art. 47 | All producing fields | Ongoing | 160 DA/m³ | ↗ Compliance plan |
| NSAS aquifer protection plan | Ministry of Environment | Hassi Messaoud | Q4 2026 | Operating license risk | ↗ Generate now |
| Gas flaring reduction plan | ALNAFT Bid Criteria | All E&P blocks | Bid submission | Bid scoring penalty | ↗ Flare-to-Compute |
| ESG disclosure — water KPIs | IOC Co-investor requirements | JV blocks | Annual | Investment risk | ↗ ESG report |
| Refinery wastewater plan | Law 83-03 (Environment) | HM Refinery 2027 | Pre-commissioning | Commissioning block | ↗ Generate now |
| Field | Flare Rate | Pipeline km | Rev Lost/yr | Capturable % | Capturable $ | 19-13 Status | DATA Action |
|---|---|---|---|---|---|---|---|
| Hassi Messaoud | 6.2% | 4.2 km | $284M | 85% | $241M | ⚠ ABOVE LIMIT | ↗ Priority capture |
| Berkine / El Borma II | 4.8% | 7.1 km | $156M | 75% | $117M | ⚠ ABOVE LIMIT | ↗ Capture plan |
| Illizi Basin | 3.9% | 12.4 km | $89M | 50% | $45M | ⚠ ABOVE LIMIT | ↗ Assess route |
| Oued Mya | 2.1% | 3.8 km | $41M | 95% | $39M | ⚠ ABOVE LIMIT | ↗ Fast capture |
| In Amenas | 1.8% | 6.0 km | $29M | 90% | $26M | ⚠ ABOVE LIMIT | ↗ Capture plan |
| In Salah | 0.7% | 2.1 km | $11M | 100% | $11M | ✓ COMPLIANT | ↗ Optimise |
| Hassi R'Mel ★ PILOT | 1.4% | 1.9 km | $18M | 97% | $17M | ⚠ ABOVE LIMIT | ★ PILOT TARGET |
| Field | TDS (ppm) | Cl⁻ mg/L | Ba²⁺ | Sr²⁺ | Li mg/L | Scale Risk | Mineral Rev | TDS Trend |
|---|---|---|---|---|---|---|---|---|
| Hassi Messaoud | 210,000 | 78,400 | 340 | 180 | 42 | CRITICAL | $25M/yr | ↑ +2,800/yr |
| Berkine / El Borma II | 145,000 | 52,200 | 180 | 120 | 28 | HIGH | $14M/yr | ↑ +1,900/yr |
| Illizi Basin | 178,000 | 64,100 | 210 | 95 | 18 | HIGH | $18M/yr | ↑ +2,100/yr |
| Oued Mya | 88,000 | 31,600 | 85 | 60 | 12 | MODERATE | $7M/yr | ↑ +900/yr |
| In Amenas | 95,000 | 34,200 | 95 | 70 | 14 | MODERATE | $8M/yr | ↑ +1,100/yr |
| In Salah | 62,000 | 22,300 | 45 | 32 | 8 | LOW | $4M/yr | ↑ +600/yr |
| Hassi R'Mel ★ PILOT | 42,000 | 15,100 | 28 | 19 | 5 | LOW | $2M/yr | ↑ +400/yr |
| Segment | TDS (ppm) | Cl⁻ (mg/L) | H₂S | CO₂ bar | Primary Mechanism | Risk Class | Action |
|---|---|---|---|---|---|---|---|
| HM — production tubing strings | 210,000 | 78,400 | YES | 0.28 | SCC + pitting + scale wedging | 🔴 CRITICAL | ↗ Deploy now |
| HM — gathering flowlines | 210,000 | 78,400 | TRACE | 0.22 | Under-deposit pitting | 🔴 CRITICAL | ↗ ILI prioritise |
| Berkine — Hassi Berkine lines | 145,000 | 52,200 | NO | 0.18 | BaSO₄ under-deposit | 🟡 HIGH | ↗ Scale + inhibit |
| Illizi — remote flowlines | 178,000 | 64,100 | TRACE | 0.14 | SrSO₄ + erosion-corrosion | 🟡 HIGH | ↗ Chemistry screen |
| Oued Mya — injection lines | 88,000 | 31,600 | NO | 0.09 | Mild pitting · NSAS interface risk | 🟢 MODERATE | ↗ NSAS cross-check |
| In Salah — production strings | 62,000 | 22,300 | NO | 0.06 | Low · standard inhibitor sufficient | 🟢 LOW | ✓ Quarterly monitor |
| Hassi R'Mel ★ PILOT | 42,000 | 15,100 | TRACE | 0.04 | Minimal · PPCA standard sufficient | 🟢 LOW | ★ Baseline + monitor |
| Revenue Stream | DOE Technology | LOW | MID | HIGH | Source |
|---|---|---|---|---|---|
| Disposal cost reduction | Argonne AMEWS | $30M | $42M | $52M | 65% recycle · AMEWS TRL 7 |
| OPEX optimization | Berkeley WaterTAP | $7M | $11M | $14M | 17.5% OPEX reduction |
| Flaring tax avoided | VIIRS + Law 19-13 | $10M | $15M | $20M | 1.4% flare rate · 97% capturable |
| Law 19-13 royalty avoided | WaterPlan Pro | $5M | $7M | $9M | 160 DA/m³ · recycled volume |
| TOTAL — Hassi R'Mel | $52M | $77M | $95M | Year 3+ at maturity | |
| Total investment Phase 1+2 | $12.8M ($4.8M + $8M) | All-in pilot cost | |||
| 5-Year Net Return | $247M | $284M | $462M | After full capital recovery | |